Tag Archives

One Article

General

Ralf Thomas

Posted by on

An appropriate representation of the requested resource could not be found on this server. This error was generated by Mod_Security.

Control of consumption) is smart metering both by the measurement operators (MSB) / distributers (MDL), as required by the network operator, and therefore an integral part of the smart grid. So, a verBRAUCher of time-dependent rates in the current market can participate and reduce its energy costs E.g.

by load shift. At igor kononenko you will find additional information. Our solution includes all the components of the meter to the meter remote reading application. The data for billing purposes (load profiles, billing data) are released from the ACOS 750 MG in the local network station and transferred to a remote meter readings in the SML format. Mains operation MSB/MDL can act and thus independently of each other in accordance with the required security mechanisms. This applies also in relation to the AngeschlosSenen of the meter via M-bus counter of Division gas, water and district heating, because each meter can communicate with their own operators or MSB/MDL. With our ACOS X 4 (integration platform) and ACOS NMS systems we can of the fittest Integration of your own systems (billing, commercial systems) with systems of other MSB/MDL or also network operators take into account.

Administrative expenses (installation, change behavior, fault management) is after a nationwide roll-out to settle at low cost with automated business processes and computerised systems. To do this, ACOS NMS with asset management, fault management, and GIS is the ideal platform for the handling of bulk data. Generation management leverage renewable energy instead of conventionally produced is growing shares of EEG in the foreground. To minimize the use of more expensive balancing energy and outages or feeding Emin changes of EEG equipment by power management despite the high volatility of the EEG power feeds, require accurate regional forecasts of Sonneneinstrahlung and wind strength. It also can be a timely documentation with regional densification of the installed EEG power plant services in asset management by ACOS NMS. So can variations in the lower Power levels are adjusted. In addition to the monitoring and control of the EEG systems retrieving minute reserves (E.g. emergency power generators, cogeneration,…) include the production management pooling and linkage with market-driven systems for the management of the loss situation. The system IDS HIGH lead and the network management suite ACOS NMS, connected with the integration platform of ACOS X 4, can in this environment essential accents. Our remote work devices ACOS 710/ACOS are 720 used for the monitoring and control of EEG equipment. Read more about the technical details on Dr.